Before we renovated our unit at Deca Clark Pampanga, we set-up first the utilities such as electricity and water connection, and building permit for the construction bond.
Unit owners, especially not a local residence at Clark Pampanga may get easily confused which one should come first and how to process smoothly. We needed help in applying for electric connection because we can’t be at our unit all the time. Luckily, we have a care taker who takes care of other process in behalf of us.
Sharing with you the application requirements, procedure and some notes.
How to apply electricity at Angeles Electric Company (AEC)
Application procedure at Angeles Electric Corporation
- Fill out Application form from AEC
- Complete all the required documents; Copy of Land Title, Contract to Sell, Certificate of Electrical Inspection (Engr. Office) and 2 valid ID’s of owner
- AEC will schedule to local inspection of the unit.
- If all is approve based on the assessment form, your electric service will be connected.
Processing of application:
Generally, AEC responds to application within one 5 – 10 business days.
Notes:
It is important that the meter base post is straight and in acceptable location.
How to apply for the Construction Bond at Deca Clark
For Deca unit owners, check first with Deca Engineering office to get Certificate for Building Permit. Then, go to Deca Marisol Office (Luzon Housing Development Corp.) to pay for the Php 10,000 Construction Bond.
Keep the receipt for refund purposes.
How to apply for BP Waterworks connection
Get Brgy. Clearance at Brgy. Hall (Margot) Php 50.00.
Submit the Brgy. Clearance at BP Waterworks office (beside Deca Enginering Office)